Define the Control Plan
Define characteristics, equipment, frequency, sample size, and acceptance criteria jointly with Quality, Engineering, and Production.
Control begins with raw materials and purchased assembly components, covers as-cast and machined parts separately, and continues through final product release. Results are linked in the system to the order, date, shift, operator, machine, and melt code, creating a traceable quality decision.
The control plan is developed jointly by Quality, Engineering, and Production from the drawing and customer requirements. Critical characteristics, measuring equipment, inspection frequency, and sample size are defined for each project.
In-process checks are performed by the operator or quality specialists according to the defined precision and frequency. An approved reference sample is retained for each part; the as-cast sample and, once it is approved, the machined sample are submitted separately for customer approval.



The inspection type, equipment, frequency, and required documentation for each part are defined according to the drawing, application, and project requirements.
Define characteristics, equipment, frequency, sample size, and acceptance criteria jointly with Quality, Engineering, and Production.
Inspect raw materials and purchased components used in product assembly and completion.
Perform visual and dimensional inspection of the start-up sample, record the result, and retain the approved reference sample.
Carry out planned inspection by the operator or Quality and record the result and acceptance status in the system.
Independently inspect the machined part, perform project-required tests, and submit the sample for customer approval.
Issue final approval for packaging and shipment, or record the nonconformity and follow corrective action through effectiveness verification.
Analyze alloy chemical composition and link the result to the melt code and route of use.
Inspect as-cast and machined parts against the drawing and project plan.
Maintain confidence in reference equipment and the tools used for inspection.
Link inspection results to production history and prevent shipment before approval.
Select any document to view a larger version.
We review your drawing, technical specification, acceptance criteria, and required documentation so the control route is clear before production begins.